BME680 LGA-8 Düşük Güçlü Gaz Basıncı, Sıcaklık ve Nem Sensörü

Diğer Videolar
May 15, 2025
Kategori Bağlantısı: sensör entegresi
Kalite sensör entegresi Çin'den https://www.icsmodules.com/sale-53234224-bme680-lga-8-temperature-and-humidity-sensor-ic-low-power-original-brand.html
Shenzhen Anxinruo Technology Co., Ltd. quality manufacturer from China.
We can supply:
entegre devre : https://www.icsmodules.com/supplier-4766068-integrated-circuit
IGBT : https://www.icsmodules.com/supplier-4766069-igbt
Mikro denetleyici MCU : https://www.icsmodules.com/supplier-4766070-microcontroller-mcu
Welcome to visit our official website : https://www.icsmodules.com
Kısa: Discover the BME680 LGA-8 Low Power Gas Pressure, Temperature, and Humidity Sensor, a high-performance IC chip designed for precision monitoring. Ideal for SMD/SMT installations, this original Intel/Altera product ensures reliable data collection with minimal power consumption. Perfect for industrial and commercial applications.
İlgili Ürün Özellikleri:
  • Low Power Gas Pressure, Temperature, and Humidity Sensor for efficient energy use.
  • Model BME680, part of the BME680 series, ensures high accuracy and reliability.
  • Packaged in LGA-8 for easy integration into various electronic systems.
  • SMD/SMT installation style for streamlined assembly and compact design.
  • New and original product from Intel/Altera, guaranteeing quality and performance.
  • Ideal for applications requiring precise environmental monitoring.
  • Available in quantities from 1 to 10,000 with flexible lead times.
  • Contact Mr. Guo for inquiries and bulk orders via email or WeChat.
Sorular:
  • What is the power consumption of the BME680 sensor?
    The BME680 is designed as a low-power sensor, making it energy-efficient for continuous monitoring applications.
  • How is the BME680 sensor installed?
    The BME680 sensor features an SMD/SMT installation style, allowing for easy and compact assembly on PCBs.
  • What is the lead time for bulk orders of the BME680 sensor?
    Lead times vary based on quantity: 3-5 days for 1-100 pieces, 5-8 days for 100-1000 pieces, and negotiable for orders over 1000 pieces.
İlişkili Videolar